High-Precision Carrier Tape for IC and SMD Packaging
High-Precision Carrier Tape for IC and SMD Packaging
Home>Products>Carrier Tape>High-Precision Carrier Tape for IC and SMD Packaging
High-Precision Carrier Tape for IC and SMD Packaging product view 1
High-Precision Carrier Tape for IC and SMD Packaging product view 2
High-Precision Carrier Tape for IC and SMD Packaging

High-Precision Carrier Tape for IC and SMD Packaging

Product Details

Place of Origin:CHINA
Brand Name:ACE DELIXIN
Certification:ROHS,SGS
Model Number:8mm-88mm

Payment & Shipping Terms

Minimum Order Quantity:1000
Price:Discussable
Packaging Details:Carton
Delivery Time:5–8 working days
Payment Terms:Discussable

Product Description

High-Precision Carrier Tape for IC and SMD Packaging

This embossed carrier tape is designed for accurate component positioning and stable feeding on high-speed SMT packaging and placement equipment. Controlled pocket and sprocket-hole geometry helps reduce feeding errors while cover tape closes the pockets against dust and component movement.

Performance Features

  • Precision-formed pockets support consistent orientation of ICs and other SMD components.
  • Controlled sprocket-hole position supports repeatable indexing on compatible equipment.
  • Anti-static material options help protect electrostatic-sensitive parts.
  • Custom tape width, pocket depth, pitch and material can be developed from a drawing or sample.
  • Matching cover tape and reels are available for a complete packaging configuration.

Typical Specification

Tape width8–88 mm, customizable
ApplicationIC, LED, connector, sensor and other SMD component packaging
ColorBlack or custom, depending on material
ESD optionSelected according to the component requirement
CertificationRoHS and SGS

Dimensional Confirmation

Any required positional tolerance, including a ±1.5 μm target, must be reviewed against the specific tape width, material, pocket design and measurement method. Provide the component drawing, EIA standard requirements, equipment model and inspection criteria for feasibility confirmation before tooling.